Hired to Create "Peace of Mind III" Plan

Thursday, December 17, 2015

Back in July we were hired to create a new version of the "Peace of Mind" plan which we'll be calling it the "Peace of Mind III" plan (SS001B). The big change to this plan will be the addition of a walk-out basement to the plan and a half bath on the main floor. This is room in the basement for an additional bedroom and a full bath. The first floor was design so you could add the screened porch or the addition bedroom wings on later. Please stay tuned for more updates on this project.

Peace of Mind II - Update

Peace of Mind II
Here are some updated pictures taken on November 20th of the "Peace of Mind II" plan that is being built on the Yellow Stone River in Montana.  As you can see the Murus Structural Insulated Panel (SIP) roof is now on with metal roofing installed and the Andersen 100 series window are in along with the Allura fiber cement siding/trim being installed. The addition of the 3rd bedroom wing balance the house of nicely.  Check back soon for more updates.
3rd Bedroom Wing
 

Connect

Phone Number:
616-954-ARCH (2724)

Email:

Website:
(Coming Soon)

Followers

Total Pageviews